• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Friday, November 14, 2025
Newsletter
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
No Results
View All Results
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
No Results
View All Results
Home Electricity

Vic transmission project energised

by Sarah MacNamara
February 5, 2025
in Batteries & Storage, Electricity, News, Projects, Renewable Energy, Substations
Reading Time: 2 mins read
A A
Image: AusNet.

Image: AusNet.

Share on FacebookShare on Twitter

AusNet has successfully energised a new terminal station, which will facilitate the connection of the KESS  (Koorangie Energy Storage System) to the Victorian transmission network. 

Situated on the traditional lands of the Barapa Barapa, Wamba Wamba and Yorta Yorta people – approximately 17km of Kerang – the 220kV Koorangie Terminal Station will support both the KESS as well as future connections to the state’s energy grid. 

Designed and developed by Edify Energy, KESS is a new 185MW/370MWh lithium-ion battery, 100 per cent owned by Sosteneo Infrastructure Partners. 

AusNet is constructing the project’s transmission infrastructure, which includes an overhead transmission line to connect to the new terminal station.  

KESS secured a System Support Agreement with the Australian Energy Market Operator (AEMO) to provide 125MW of system strength services to improve the region’s network stability. KESS is expected to commence operations in 2025 and has a 20-year contracted service term with AEMO. 

AusNet said that this shared network asset will not only increase the renewable hosting capacity of the Murray River REZ by up to 300MW and power 350,000 homes for two hours but will also facilitate more renewable connections in future.  

The battery is supported by a 15-year term offtake agreement with Shell Energy Australia for the full 185MW/370MWh. 

Related Posts

SMC batteries, with their lifespans of up to 20 years, can be seen as a long-term infrastructure asset. Image: Decon Corporation

SMC batteries: An explainer

by Tom Parker
November 11, 2025

Decon Corporation is focused on developing a safer energy alternative with sodium metal chloride (SMC) batteries. As Australia pushes forward...

AGL Tilt

Why AGL divested its Tilt stake

by Tom Parker
November 11, 2025

AGL announced yesterday it was offloading the majority of its 20 per cent stake in Tilt Renewables as it recycles...

clean energy projects

A guide to project approvals under EPBC Act reform

by Staff writer
November 11, 2025

Warren McGrath, Beca's recently appointed technical director – environmental science, shares proactive methods to getting clean energy projects over the...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Energy is a thought-leading, technology-neutral magazine, developed to help the industry answer some of the Energy sector critical questions it is currently grappling with.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Energy

  • About
  • Advertise
  • Subscribe
  • Events
  • Contact
  • Digital Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Renewable Energy
  • Electricity
  • Projects
  • Networks
  • Sustainability
  • Gas

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events
  • Newsletter

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited