Tasmanian Basslink Interconnector out of action

Tasmanian Basslink Interconnector out of action
Share

The Tasmanian Basslink Interconnector will be offline until mid-October while it undergoes repairs.

A failure in the low voltage cable (metallic return) is believed to have caused the interconnector’s Direct Current Protection system to trip on the morning of 24 August.

The identified failure is located in an above ground section of the low voltage cable in the transition station in Gifford, Victoria. Basslink is currently preparing a plan for the repair.

Based on current information, Basslink said it has notified AEMO that the interconnector would be offline until mid-October. It also proposed further testing, which would better inform the return to service date.

Hydro Tasmania’s Acting Chief Operations Officer, Jesse Clark, said Tasmania has ample on-island resources to manage the situation. 

“We have a world-class hydropower system that’s served Tasmanians well for more than a century, excellent wind power resources and the ability to run gas-fired generation if required,” Mr Clark said.

“While the news that Basslink could be offline until mid-October is not ideal, it won’t cause any energy security concern for Tasmania.

“On the back of good winter inflows, Hydro Tasmania’s storages are at a very healthy level of 45.5 per cent, which is well above the High Reliability Level.”

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

©2019 Energymagazine. All rights reserved

Log in with your credentials

or    

Forgot your details?

Create Account