• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Saturday, July 18, 2026
Newsletter
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
No Results
View All Results
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
No Results
View All Results
Home Electricity

Tasmanian Basslink Interconnector out of action

by Staff Writer
August 28, 2019
in Electricity, Networks, News
Reading Time: 2 mins read
A A
Tasmanian Basslink Interconnector out of action
Share on FacebookShare on Twitter

The Tasmanian Basslink Interconnector will be offline until mid-October while it undergoes repairs.

A failure in the low voltage cable (metallic return) is believed to have caused the interconnector’s Direct Current Protection system to trip on the morning of 24 August.

The identified failure is located in an above ground section of the low voltage cable in the transition station in Gifford, Victoria. Basslink is currently preparing a plan for the repair.

Based on current information, Basslink said it has notified AEMO that the interconnector would be offline until mid-October. It also proposed further testing, which would better inform the return to service date.

Hydro Tasmania’s Acting Chief Operations Officer, Jesse Clark, said Tasmania has ample on-island resources to manage the situation. 

“We have a world-class hydropower system that’s served Tasmanians well for more than a century, excellent wind power resources and the ability to run gas-fired generation if required,” Mr Clark said.

“While the news that Basslink could be offline until mid-October is not ideal, it won’t cause any energy security concern for Tasmania.

“On the back of good winter inflows, Hydro Tasmania’s storages are at a very healthy level of 45.5 per cent, which is well above the High Reliability Level.”

Related Posts

AI framework data centres

What Australia’s AI framework means for the data-centre sector

by Tom Parker
July 17, 2026

Data centres form a central cog of the Federal Government’s AI framework announced this week, where new protocols will be...

A gas turbine in an industrial facility. Image: Max/stock.adobe.com

How the data-centre boom is fuelling gas technology costs

by Tom Parker
July 15, 2026

CSIRO's GenCost 2025–26 report details the most up-to-date cost projections involved with building and operating Australia’s electricity generation, storage and...

Vestas australian wind farms

How many Australian wind farms does Vestas own?

by Tom Parker
July 14, 2026

Vestas is not a familiar name in the ownership of Australian wind assets, so how many local wind farms does...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Energy is a thought-leading, technology-neutral magazine, developed to help the industry answer some of the Energy sector critical questions it is currently grappling with.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Energy

  • About
  • Advertise
  • Subscribe
  • Events
  • Contact
  • Digital Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Renewable Energy
  • Electricity
  • Projects
  • Networks
  • Sustainability
  • Gas

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events
  • Newsletter

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited