• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Tuesday, January 20, 2026
Newsletter
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
No Results
View All Results
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
No Results
View All Results
Home

Second stage works start on QLD solar farm

by Energy Journalist
July 27, 2018
in News, Projects, Renewable Energy, Solar, Sustainability
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

The second stage of works on the Yarranlea Solar Farm in Queensland have begun, with Toowoomba based earthworks and surveying firms moving to the site for construction.

Preliminary works have been completed, with the next phase of construction involving bulk earthworks to prepare the site for installation of the solar panels and substation equipment.  

The Yarranlea Solar project bulk earthworks contract was awarded to Sedl Contractors, the Toowoomba-based, family-owned earthmoving civil contractors.

The ongoing survey works have been allocated to local firm Byrne Surveyors, a long-established Toowoomba survey firm. For over 50 years Byrne Surveyors has undertaken surveys throughout South West Queensland, covering the Darling Downs, Lockyer Valley, Granite Belt and Maranoa Districts.

Yarranlea Solar will be outsourcing construction contracts for the solar farm. This is specialised work, and local contractors and firms will be utilised where possible.

Planting of screening vegetation is also scheduled to commence soon.

As owners of the Yarranlea Solar Farm project, Risen Energy will progress the project from detailed engineering design, through construction, commissioning and ultimately the operation of the solar farm.

It is anticipated that approximately 200 positions will be created during the construction of the Yarranlea Solar farm, which will have approximately 400,000 solar panels installed at the site. The workforce on site at any one time will vary as the project cycles through various construction phases (civil works, foundations, assembly, electrical assembly, cabling, commissioning).

Construction of the solar installation started mid-year and will continue through to 2019.

Yarranlea Solar is working with Ergon to develop a switching station which will allow the solar farm to connect to the existing 110kV network.

The Yarranlea Solar management team is currently addressing accommodation arrangements within the town of Pittsworth.

Related Posts

Origin Eraring

Eraring coal-fired power station extended to 2029

by Tom Parker
January 20, 2026

Origin Energy will continue operations from all four units of the Eraring coal-fired power station until April 2029 due to...

Cheaper Home Batteries scheme

What a soaring Cheaper Home Batteries scheme means for prices

by Tom Parker
January 20, 2026

The Cheaper Home Batteries scheme has seen meteoric uptake in its first 12 months, with 200,000 installations since it was...

BESS

‘Extremely competitive’: How the Australian BESS market is rapidly changing

by Tom Parker
January 19, 2026

International players see Australia as a key renewable energy hotspot, particularly in the BESS (battery energy storage system) game. A...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Energy is a thought-leading, technology-neutral magazine, developed to help the industry answer some of the Energy sector critical questions it is currently grappling with.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Energy

  • About
  • Advertise
  • Subscribe
  • Events
  • Contact
  • Digital Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Renewable Energy
  • Electricity
  • Projects
  • Networks
  • Sustainability
  • Gas

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events
  • Newsletter

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited