• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Sunday, July 12, 2026
Newsletter
SUBSCRIBE
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
No Results
View All Results
  • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
No Results
View All Results
Home

First off-grid Tesla system installed

by Energy Journalist
October 3, 2017
in Electricity, Networks, News, Renewable Energy
Reading Time: 3 mins read
A A
Share on FacebookShare on Twitter

Queensland’s Logan City Council has installed Australia’s first off-grid system powered by Tesla Powerpack to deliver a reliable and safe solution to water disinfection.

In a project delivered by Council’s Logan Water Infrastructure Alliance, Australia’s leading battery and solar provider, CSR Bradford, has installed the Tesla Powerpack products.

The Tesla-supported micro-power grid and electro-chlorinator will provide around the clock solar-power to help maintain local drinking water quality 24 hours a day. Up to 200,000 people will benefit from the solution by the time the region is fully developed.

The project has already delivered the Logan City Council a capital cost saving of $1.9 million and operational cost savings valued at almost $50,000 per year.

City of Logan Mayor, Luke Smith, said innovation was high on Council’s agenda and Council was committed to leading by example and turning words into action.

Mr Smith said the 20 Megalitre Round Mountain Reservoir was brought into service in 2014 to provide drinking water for residents in Flagstone, Yarrabilba, North Maclean, Spring Mountain and Woodhill.

“This is set to be one of the fastest growing areas in South East Queensland over the next two decades but with that growth comes the issue of building assets larger than are needed right now,” Mr Smith said.

“We were concerned until demand increases, water stored in the network may age and not stay at the highest possible quality.

“We decided there was a need for a dedicated water chlorination station at the reservoir.

“The reservoir site is not connected to mains power or accessible via a sealed road so an innovative approach was required to maintain water quality from the reservoir.”

Mr Smith said a number of options were investigated, with a solar powered electro-chlorination facility confirmed as the preferred technology, and CSR Bradford was engaged to supply and install the system.

CSR Bradford Business Manager, Ashleigh O’Brien, said the project was the first off-grid commercial solar and battery system in Australia powered by Tesla Powerpack, and showcased the growing potential for Australian assets to achieve energy security through solar and battery technology.

“CSR Bradford is incredibly proud to be playing its part in providing a solution which will see solar and battery technology play a greater role for commercial assets,” Ms O’Brien said.

“The electro-chlorinator is powered by 323 solar panels and a 95kWh capacity Tesla Powerpack, that will help provide water quality 24 hours a day.

“With commercial power prices soaring and homeowners increasingly struggling to pay their bills, CSR Bradford stands ready to demonstrate how improvements in battery technology and solar can empower asset owners, bring down prices, and safeguard them against the risk of shortages in the electricity market.

“The project involved the Bradford team working with Tesla to design and install a solar PV and commercial battery solution which will work harmoniously in response to the site’s real-time energy requirements, and its success signals further potential to roll this technology out across the country”

Related Posts

Western Sydney International Airport

Sydney’s second airport will be powered by 100 per cent renewables

by Tom Parker
July 7, 2026

The new Western Sydney International Airport is set to be powered by 100 per cent renewable electricity under a seven-year...

Orana BESS

Innovative 12-year agreement underpins 415MW Orana BESS

by Tom Parker
July 7, 2026

Revenue from the Orana BESS will be generated through a 12-year virtual tolling agreement between EnergyAustralia and Akaysha Energy.

Image: Farhad/stock.adobe.com

Are you prepared for AEMO’s Industry Data Exchange?

by Tom Parker
July 7, 2026

AEMO is progressing the Industry Data Exchange (IDX), which represents a significant evolution in how data is exchanged across the...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Energy is a thought-leading, technology-neutral magazine, developed to help the industry answer some of the Energy sector critical questions it is currently grappling with.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Energy

  • About
  • Advertise
  • Subscribe
  • Events
  • Contact
  • Digital Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Renewable Energy
  • Electricity
  • Projects
  • Networks
  • Sustainability
  • Gas

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Events
  • Features
  • Electricity
  • Gas
  • Renewables
    • Renewables
    • Batteries & Storage
    • Hydro Power
    • Hydrogen
    • Solar
    • Wind
  • Smart Energy
  • Podcasts
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events
  • Newsletter

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited